Roadworks

Published: 29 April 2024

Leeds Road, Collingham – Two-Way Signals – Installation of New Junction To Miller Homes Development and Footway Improvement Works on Leeds Road from:  20/09/2023 to 30/06/24

Collingham – Road Closure Wattlesyke - Slip Roads leading onto The Roundabout (also affects Boston Road, & West Woods Road) from 11/03/2024 to 15/03/2024

School Lane Collingham – Road Closure – The Nook to Brigham from 13/05/2024 to 28/05/2024

Moderate School Lane Collingham – Multi-Way Signals - Garth End to Leeds Road from 10/06/2024 to 24/07/2024

Crabtree Green – Multi-Way Signals –  Wayside – Northern Gas Networks from to 12/08/2024 to 27/08/2024

Brookside Collingham Multi-Way Signals – Leeds Road To Number 69 Northern Gas Networks from 19/08/2024 to 24/09/2024

 Leeds City Council are planning to install drainage into Leeds Road, Collingham in the vicinity of Miller Homes Development between 2nd and 13th April 2024.To carry out the works safely, 2-way signals need be in place for the whole day for the duration of the works. The lights will be manually controlled between 6.30-9.30am and 15.30-18.30pm to manage traffic as effectively as possible especially in peak hours as some delays might be expected. The works would be carried out for extended working hours and including weekends to minimise the duration as much as possible. The location of the works is shown at the following link: https://one.network/?GB135437794

 Mill Lane, Collingham, Road Closure Olive Branch, Leeds Road from  22/04/2024 to 25/04/2024

We have been informed by Leeds City Council that due to extreme rain and very wet ground conditions, the works to install drainage into Leeds Road in Collingham, has not gone as planned and will continue until Wednesday 17th April.

Jewitt Lane – Road Closure from School Lane To  Wetherby Road from 08/07/2024 to 22/07/2024

Diversion Works – Leeds Road - Yorkshire Water will be undertaking diversion works and the installation of drainage infrastructure beneath the existing road. This will require two-way lights to be in operation on Leeds Road for 24 hours a day from Saturday 4th May to Sunday 9th June.